We are planning on rolling out kernel patches to the Virtuozzo servers Wednesday evening (3rd). This will result in VPS’s hosted on the Virtuozzo environment being unavailable for up to 30 minutes at a time whilst the servers reboot. Maintenance is scheduled to commence at 01:00 and should be completed by 04:00 During this time…
Category: Planned Maintenance
Hosting, Planned Maintenance
Windows Updates
by jon • • 0 Comments
Our windows hosting platforms are undergoing patching at this time and services hosted on these Windows servers will be unavailable whilst the patches are installed and the servers are rebooted. We will post again when the latest updates have been installed and normal service is resumed. UPDATE @ 22:15 08/09/07 10 of our 11 windows…
Bulletin Board, Planned Maintenance
Upgrades to Plesk 8.2
by jon • • 0 Comments
Over the coming weeks we will be upgrading all Plesk nodes to Plesk 8.2.0 More information on Plesk 8.2 can be found in the following documents. What’s New in Plesk 8.2 (PDF, 304KB) Plesk Datasheet (PDF, 166KB) We will work to minimise any disruption caused by these upgrades which will be performed overnight during normal…
CoLocation Centres, London 1 (Hex), London 2 (TFM120 - Telehouse West), London 3 (TFM3 - Telehouse North), Planned Maintenance
Router Upgrades
by jon • • 0 Comments
31st May – Update Owing to certain issues with AS community handling in the maintenance release installed yesterday we are planning a further “emergency” maintenance upgrade this evening with an additional patch which resolves issues with community handling in this release. We anticipate a brief outage at 11pm to transit routes via Tiscali and NTT…
Bulletin Board, Hosting, Latest, Planned Maintenance
Control Panel Maintenance
by jon • • 0 Comments
The main control panel server has been experiencing some technical difficulties over the last 24-48 hours. As a precaution we have reverted to backup hardware and have taken the main server offline for a full diagnostic. As a result customers may notice slightly slower response times from the control panel. We apologies in advance for…
Bulletin Board, Planned Maintenance
Fabric Reload Required
by jon • • 0 Comments
As a result of last night’s network problems we are rolling out modifications to our core fabric which will require a reload of each core cisco on our network. We have already performed a reload at THN and IPH this morning as part of emergency remedial maintenance. We plan on performing a reload in HEX…
CoLocation Centres, London 2 (TFM120 - Telehouse West), Planned Maintenance
Switch Upgrades (continued)
by jon • • 0 Comments
There will be a brief outage at 2am Friday morning while we update the firmware on one of our core switches at London-2 (IPH). This outage should last for no more than 5 minutes whilst the switch reboots. Please address any queries to support@fido.net
Bulletin Board, CoLocation Centres, Latest, London 1 (Hex), Planned Maintenance
Switch Upgrades
by jon • • 1 Comment
There will be a brief outage at 2am Thursday morning while we update the firmware on one of our core switches at London-1 (Hex). This outage should last for no more than 5 minutes whilst the switch reboots. Please address any queries to support@fido.net
Bulletin Board, Hosting, Latest, Planned Maintenance
Control Panel Upgrades
by jon • • 0 Comments
This upgrade has now been scheduled for Monday morning at 08:00 UTC In order to facilitate these upgrades we need to disable the control panel for roughly 1 hour today, Sunday 11th at 18:00 in order to perform a complete static backup of all databases and files to ensure a safe back out strategy in…
Broadband, Planned Maintenance
Maintenance on Broadband Network
by jon • • 0 Comments
BT have given advance notice of Planned Engineering Works that will affect one of our 622 Centrals. Work to replace a damaged cable will commence on 20th March 2007 at 22.00hrs and will take upto 10 hours to complete. Therefore there is a potential that the Telehouse 1 central pipe will be unavailable for all…