Fido.Net Status Updates

Category: Planned Maintenance

Planned changes and maintenance. Things we intend to do going forwards. Plans and road map

Scheduled Maintenance – 11.01.09

We will be performing routine maintenance between 00:00 and 04:00 on Saturday morning. During this time, access to the control panel will be limited as we perform database maintenance. Our Cisco infrastructure will also undergo routine firmware upgrades which will result in each switch being reloaded in turn causing a brief period of down time…

Control Panel Maintenance

Following on from routine maintenance overnight, we have experienced some technical issues which have resulted in a longer than anticipated outage for the Fido Control Panel. Our engineers are actively working on a solution, and we hope to restore control panel access within the next 2-3 hours. Please accept our apologies for any inconvenience this…

Planned Maintenance – 31.07.08

Window Commences: 2008-07-31 23:00:00 GMT (UTC + 0) Window Concludes: 2008-08-01 06:00:00 GMT (UTC + 0) During the above window the fibre links between each of our 3 UK sites will be taken off line for approximately 10 minutes at a time to perform maintenance and upgrades. Whilst these upgrades are performed traffic between sites…

Routine Maintenance

UPDATE Thursday 17th July Maintenance has now been completed. ===== Monday 14th July We will be performing routine maintenance Thursday morning Maintenance will commence at approximately 3:30 am and we anticipate it should be concluded by 04:30 During this time each of our Cisco switches will be rebooted in turn to apply new settings /…