Redbus Power Failure

We are currently experiencing issues with the mains power supplying the 7th floor infrastructure at Harbour Exchange 6/7. Power has not been transferred to the UPS
and generator systems due to a fault that is currently being investigated and this has resulted in a loss of power to 7th floor customer equipment at the site.

Our specialist engineers are working to resolve the issue as a matter of priority and we will provide a further update once power has been restored or if there are any
changes to the current situation.

TelecityGroup Incident Report – Harbour Exchange 6&7 Power Incident 06.07.11