Due to circumstances outside of our control this maintenance could not be completed as scheduled. Due to the urgent nature of this maintenance we will be undertaking the work Saturday evening instead and will attempt to keep any disruption to an absolute minimum.
Maintenance Window – 23:00 – 1st August – 04:00 -2nd August 2014
We have identified an issue with one of the PDUs in TeleHouse North and as a precaution are planning to replace the unit Friday evening.
During the maintenance window a number of servers and switches will need to be powered down and relocated to a new PDU
Whilst we intend to keep any disruption to a minimum, there will be brief periods where by some customer connections are disrupted or where customers see longer than normal routes across the network as we send traffic over alternative peers during the maintenance window.
We will be taking the opportunity to re-route some fibre connections and generally tidy the rack at the same time although we do not anticipate this work will cause any additional disruption (as the switches will already be powered down by this stage).
Please accept our apologies for the short notice and any disruption which this emergency maintenance may cause.