We believe we have identified an issue which has been causing a small amount of packet loss in the network following a configuration error during the upgrade / install process which was completed over the Bank Holiday weekend.
We have scripted a configuration change which will roll out to the new core at 01:00 BST this morning. This change will reset the affected interfaces and we hope resolve the errors / collisions we are seeing on those interfaces.
Unfortunately we anticipate a period of roughly 20 minutes following on from the port resets where there will be a period of network instability as affected BGP sessions come back up.
Our apologies for the inconvenience that this emergency corrective action will cause
1 comment for “Emergency Maintenance – Line card reset”