Lon-2 switch maintenance (l2-r2-sw1)

As part of our ongoing policy of preventative maintenance we need to perform a reboot of switch l2-r2-sw1 which is located in our London 2 facility to clear a stuck CAM table and resolve other minor technical issues.

We plan to perform the reload between 00:01 and 00:30 Sunday morning, and during this time any node which has a single leg and is connected to the backbone via this switch will be affected.

We anticipate the reload will take no more than 7 minutes.

00:08

This maintenance has just started

00:13

the initial  reload has completed

 

00:20 checks have indicated that a further reload is required

00:24

the second reload has completed and changes have now been confirmed

This concludes this evenings emergency maintenance

 